The Railway Technical Website
페이지 정보
작성자 Candra 작성일 25-09-09 20:56 조회 5 댓글 0본문
Since the present might have been switched off to stop an arc or because of a brief circuit, it is important that the train does not connect the useless part to the reside section by passing over the hole and allowing its busline to bridge the hole. The facility losses might be diminished by locating footwear along the prepare and connecting them collectively by a cable often known as a busline. The tendency of return currents to wander away from the running rails into the bottom can set up electrolysis with water pipes and related metallics. Transmission of energy is at all times alongside the monitor via an overhead wire or at ground stage, using an extra, third rail laid near the operating rails. Although 3rd rail is taken into account a suburban or metro railway system, 750 volt DC third rail supply has been used extensively over southern England and trains using it run often up to 145 km/h.
This has run in parallel with the event of energy electronics and microprocessors. In the final 20 years there has been a rapid acceleration in railway traction growth. Overhead current collectors use a "pantograph", so called as a result of that was the form of most of them until about 30 years in the past. Many installations seen at the moment were first constructed greater than a hundred years in the past, some when electric traction was barely out of its diapers, so to talk, and this has had a great influence on what is seen right this moment. What had been the accepted norms for the trade for generally, eighty years, have suddenly been thrown out and changed by basic modifications in design, manufacture and operation. Compressed air pressure is most popular for prime velocity operation. Broadly talking, the higher speeds, the extra complex the "stitching", although a simple catenary will normally suffice if the support posts are close enough collectively on a high speed route. High speeds worsen the problem. Nevertheless, some embarrassing incidents in Asia with disintegrating manhole covers near a metro line as lately as the early 1980s signifies that the problem still exists and isn’t at all times correctly understood.
Because the adjustments have been so speedy, there are still plenty of examples of the unique expertise around and in common use, so I have covered these in my articles. More modern programs use a single arm pantograph - really just half of the original shape - a neater trying design (photo above). Modern installations usually use the simple catenary, slightly sagged to offer an excellent contact. Figure 5: Simple diagrams of various kinds of 3rd rail contact systems. Other than solely requiring a simple management system for the motors, the smaller dimension of city operations meant that trains were usually lighter and needed less energy. The opposite footwear on the identical circuit should be remoted while this is finished, until the current is switched off from the whole part - maybe disabling a number of different trains. The contact with the overhead wire just isn't normally damaged but the third rail should be broken at junctions to allow for the continuity of working rails. It have to be protected, economical and person friendly. London Underground is the most important user of the 4-rail system on the planet.
There may be a wide variety of electric traction programs around the globe and these have been constructed in response to the type of railway, its location and the technology available at the time of the installation. The 3rd rail system is frequent around the world but the 4th rail is uncommon. These third rail breaks, or "gaps", as they are called, can lead to loss of power on the practice. To begin with, the electric railway needs a power supply that the trains can entry at all times. At varied points along the line, there might be places where trains will be quickly isolated electrically from the supply system. You will often see trains with only one pantograph however, on trains which use sneakers, there are always a number of shoes. It will possibly use either DC (direct current) or AC (alternating current), the former being, for many years, simpler for railway traction purposes, the latter being better over long distances and cheaper to install however, till recently, more complicated to manage at practice degree. AC methods always use overhead wires, DC can use both an overhead wire or a 3rd rail; both are common.
- 이전글 10 Things That Your Family Teach You About Car Locksmith Mobile
- 다음글 It's The Ugly Facts About Doors And Windows
댓글목록 0
등록된 댓글이 없습니다.